I managed the 9 mm height
After some fiddling with the cables connecting the different parts all the hardware is now inside the box. I made some connectors for the batteries in case they will run flat. In theory it will happen after I made some 250 mesurements. This ends up to 7 measurements a day on a 5 week period which should be more than necessary. I measured the leakage current to 0.00 mA but the analog part has only been tested for some hours.
Kommentarer
Trackback